Case Studies
Scottish Hydro Electric employed eTec to carry out a structural integrity analysis of two large 3m fabricated spherical valves Read more...
eTec were employed to support the refurbishment of a 138” butterfly valve for a hydro station in Scotland Read more...
Drax Power employed eTec to design, manufacture and install a replacement 96” Pump Discharge valve on the original Drax station in July 2008 Read more...